High quality Cisco ICND2 200-105 dumps pdf practice files and dumps vce youtube update free demo. Get the best Cisco ICND2 200-105 dumps exam training resources and study guides free try from leads4pass. https://www.leads4pass.com/200-105.html dumps pdf practice materials. Latest Cisco ICND2 200-105 dumps exam questions and answers free download, pass Cisco 200-105 exam test easily at the first time.
High quality Cisco 200-105 dumps pdf files free download from google drive: https://drive.google.com/open?id=0B_7qiYkH83VRS3BsT2duT3pTSlU
High quality Cisco 300-075 dumps pdf files free download from google drive: https://drive.google.com/open?id=0B_7qiYkH83VReEMzbXFDTzJDZEU
Vendor: Cisco
Certifications: ICND2
Exam Name: Interconnecting Cisco Networking Devices Part 2 (ICND2 v3.0)
Exam Code: 200-105
Total Questions: 204 Q&As
QUESTION 1
The command frame-relay map ip 10.121.16.8 102 broadcast was entered on the router. Which of the following statements is true concerning this command?
A. This command should be executed from the global configuration mode.
B. The IP address 10.121.16.8 is the local router port used to forward data.
C. 102 is the remote DLCI that will receive the information.
D. This command is required for all Frame Relay configurations.
E. The broadcast option allows packets, such as RIP updates, to be forwarded across the PVC.
Correct Answer: E
QUESTION 2
Which two advantages of an overlay network that consists of virtual switches on supervisors compare with those of physical networks? (Choose two.)
A. Ability to change the logical network topology more easily.
B. Ability to experience higher performance of traffic forwarding.
C. Overlay networks integrate with virtual machines more closely
D. They can support more routing protocols.
E. They are more secure.
Correct Answer: AC
QUESTION 3
You review a Cisco onePK-based application and you notice that the VTY Service Set is used to collect interface statistics. 200-105 dumps Which recommendation can you make to better leverage the programmatic capabilities of Cisco onePK?
A. Optimize the regular expression syntax.
B. Limit VTY Service Set usage to commands that return less than five lines of output.
C. Collect interface statistics using the native onePK APIs.
D. Always develop onePK-based application in multiple programming languages.
E. Use the Utility Service Set instead of the VTY Service Set.
Correct Answer: C
QUESTION 4
What are two drawbacks of implementing a link-state routing protocol? (Choose two.)
A. the sequencing and acknowledgment of link-state packets
B. the requirement for a hierarchical IP addressing scheme for optimal functionality
C. the high volume of link-state advertisements in a converged network
D. the high demand on router resources to run the link-state routing algorithm
E. the large size of the topology table listing all advertised routes in the converged network
Correct Answer: BD
QUESTION 5
What is the minimum package that is required to develop a custom Cisco Unified Intelligence Center report for a Cisco Unified CCX deployment?
A. Cisco Unified CCX Premium
B. Cisco Unified CCX Enhanced
C. Cisco Unified Intelligence Center Premium
D. Cisco Unified Intelligence Center Standard
Correct Answer: C
QUESTION 6
Refer to the exhibit.
How will the router handle a packet destined for 192.0.2.156? 200-105 dumps
A. The router will drop the packet.
B. The router will return the packet to its source.
C. The router will forward the packet via Serial2.
D. The router will forward the packet via either Serial0 or Serial1.
Correct Answer: C
QUESTION 7
Refer to the exhibit.
At the end of an RSTP election process, which access layer switch port will assume the discarding role?
A. Switch3, port fa0/1
B. Switch3, port fa0/12
C. Switch4, port fa0/11
D. Switch4, port fa0/2
E. Switch3, port Gi0/1
F. Switch3, port Gi0/2
Correct Answer: C
QUESTION 8
Which two benefits of ACI help improve the time required to deploy an application? (Choose two.)
A. enabling software developers to create development environments similar to production
B. eliminating the need for expensive Layer 4 to Layer 7 service appliances
C. eliminating IP addressing from software stacks
D. evolving the IT model from manual workflows to an application model that automates deployment, operations, and visibility
Correct Answer: AD
QUESTION 9
Which option about QoS polices created by Cisco onePK policy service set is true?
A. Polices do not show up in device configuration and persist until the device is reloaded.
B. Policies do not show up in device configuration and are removed when onePK application sessions are disconnected.
C. Policies show up in device configuration and persist until the device is reloaded.
D. Policies show up in device configuration and are removed when onePK application sessions are disconnected.
Correct Answer: B
QUESTION 10
Which statement is true concerning the data center access layer design? 200-105 dumps
A. The access layer in the data center is typically built at Layer 3, which allows for better sharing of services across multiple servers.
B. With Layer 2 access, the default gateway for the servers can be configured at the access or aggregation layer.
C. A dual-homing NIC requires a VLAN or trunk between the two access switches to support the dual IP addresses on the two server links to two separate switches.
D. The access layer is normally not required, as dual homing is standard from the servers to the aggregation layer.
Correct Answer: B
QUESTION 11
If the client has equipment from multiple vendors in their network, which statement about the technologies that can be used is true?
A. Cisco onePK is a good candidate because it is vendor agnostic.
B. Cisco onePK is vendor-specific and therefore cannot control all the equipment.
C. OpenFlow is not a good candidate because it is vendor-specific.
D. OpenFlow is not a good candidate because it is only for Layer 2 switches.
Correct Answer: B
QUESTION 12
In the Agile software development process, which two principles align with customer communications? (Choose two.)
A. Software releases are held until quality gates are met.
B. Co-location of business-focused individuals and developers for face-to-face conversation is best.
C. Key developers should have a proxy that intercepts rapidly changing requirements.
D. Customer requirements are fully collected before development ensues.
E. Changing requirements are welcome, even late in development.
Correct Answer: BE
Reference: https://www.leads4pass.com/200-105.html dumps exam questions and answers update free try.